Sites and outdoor assets: what to measure, and where it goes.

Fence-line air, noise and weather, structure tilt, stormwater discharge and gas skids.

Construction site or yard perimeter

Dust, gases, sound and weather

Sound familiar? “When something happens on site, it’s our word against theirs.”

Sensors
Where it goesAir-quality and sound stations on poles at the fence line on the sensitive (downwind or neighbor) sides; the weather station on a mast clear of buildings.
How it mountsPole or mast, reporting through an outdoor cellular gateway (No. 39).
How manyTwo or more fence-line points per site
What it readsParticulates, gases, weather and sound (dB)
What it catchesDust and noise events
What you getA time-stamped record before a complaint becomes a stop-work order
Pairs with
Add No. 138 to a plan →

Hoist, scaffold or structure

Tilt

Sensor
Where it goesBolted to the structure at a point that moves with it.
How it mountsBolt or adhesive.
How manyOne per structure
What it readsTilt angle; movement events
What it catchesMovement, settling
Add No. 24 to a plan →

Stormwater outfall or discharge

pH and level

Sensors
Where it goespH electrode in the discharge channel or sump; ultrasonic level sensor over the channel.
How it mountsElectrode on a 5 m cable; bracket for the level sensor.
How manyOne pH electrode and one level sensor per outfall
What it readspH; level
What it catchesOut-of-range discharge
Add No. 172 to a plan →

Gas skid, compressor station or wellhead

Vibration, gas pressure drop, tilt and fence-line air

Sensors
Where it goesExplosion-proof vibration monitors on compressor and blower bearings inside the zone; gas pressure drop across the filters and the polisher; tilt on the skid; an air station at the fence line.
How it mountsWork under the site’s hazardous-area permits; only explosion-proof devices go inside the zone.
How manySet per skid at the assessment
What it readsVibration; differential pressure; tilt; fence-line air
What it catchesBearing faults, loaded filters, skid movement, emissions at the fence line
Pairs with
Add No. 06 to a plan →

Placement and quantities are starting points from Cognituv’s install guidance. A Cognituv engineer confirms them for your site, and the product data sheet governs. Electrical and hazardous-area work follows the site’s own rules and permits.

All asset groups →Ask an engineer about your equipment →

Have an equipment list?

Upload it in the planner. It suggests what to measure on each asset and a gateway to carry it, and a Cognituv engineer confirms the plan.

Prefer to talk? Call 1-888-580-8738

Plan your system