Finance · Commercial office

Morgan Stanley: Chosen over seven competing solutions.

Global headquarters · Times Square, New York, NY

A third-party industrial hygienist evaluated eight solutions for energy efficiency and occupant wellbeing. Cognituv on-coil UV-C was selected — and verified.

Morgan Stanley’s headquarters tower in Times Square, its name lit on the facadeTimes Square, New YorkPhoto: PLBechly, CC BY-SA 4.0, cropped
Cognituv Grid UV-C lamps lit across the coil of an air handling unitInside: the air handlers

Identify · Apply · Verify™

How it was done.

  1. Identify

    A third-party global industrial hygienist firm was engaged to validate the most effective long-term solution for energy efficiency and occupant wellbeing.

  2. Apply

    Cognituv Grid continuous on-coil UV-C in the air handling units, with dosage, configuration, and placement optimized for maximum effectiveness.

  3. Verify

    Swab tests, air-quality sampling, HVAC performance and energy analysis — dual-confirmed by Cognituv and the hygienist firm.

Successful outcomes

What changed.

Chosen over 7 alternatives, including another UV-C firm

  • Energy savings with improved HVAC efficiency
  • Continuous, automated biofilm elimination
  • Improved indoor air quality for occupant health
  • Presented as a case study at AHR Expo
THIRD-PARTY EVALUATIONOption 1Option 2Option 3Option 4Option 5CognituvSelectedOption 6Option 7Verified by an industrial hygienist

Products in this project

Installed: Cognituv Grid on-coil UV-C · AHU integration · Third-party verification. Source: Cognituv customer case study.

Start with a no-cost facility assessment.

A call with an engineer, then a written recommendation for treatment, monitoring or both, sized to your equipment.

Book an assessment